Veragouth e Xilema è la definizione attuale di un’azienda protagonista in Ticino da quasi un secolo nel settore della falegnameria e carpenteria edile.
12.10.23
Girondella, between contemporaneity and memory
Video interview with architect Mario Cucinella
12.10.23
School gyms in Gordola and Bellinzona
Large wooden exoskeletons as a paradigm of flexibility
8.9.22
How our technical department works
From drawing to quality finished work. In between, the knowledge of those with direct experience of wood.
30.9.21
Team Veragouth and Xilema
25 professionals including engineers, architects, designers and draughtsman, 4 sector directors and over 70 specialised workers
14.2.21
Veragouth and Xilema adopts Minergie
The top choice in terms of environmental sustainability
15.1.21
Veragouth and Xilema, industrial partners in research projects
Responsibility for the future
1.12.23
Mario Botta's new project for the territory
“Nuova Valascia” and “Gottardo Arena” are the names by which the new ice stadium in the municipality of Quinto, which hosts the home games of the Hockey Club Ambrì Piotta, is commonly referred to. A multifunctional facility, a pole of attraction for the entire region. The new facility replaced the old one and is located at an altitude of 980 m, between the airport and the motorway. It has a total capacity of 6775 spectators. This was a complex project in which the presence of prefabricated elements made us active players and involved mainly in the realisation of the structural framed and insulated facades, the suspended ceilings and the ventilated facades. For the pre-aged larch beton grau cladding, 17,000 ml of planks were laid.
Location: Ambrì
Year: 2021
Arch: Mario Botta Architects
Video: Christian Ruisi